Record it once, on site, when it happens.
Cabledox builds the handover pack as you go. No writing up test results in the van. No schedules two revisions out of date. No pack rebuilt from memory weeks after everyone left site.
Estimate how many hours and labour costs your business could recover with our free Waste Audit.
The Hidden Cost of Poor Cable Management
Every hour lost to documentation is an hour you can't bill — and a risk to your handover.
Hours wasted searching
Teams lose hours every week hunting for the latest cable schedule, drawing or test record.
QA recorded days later
Quality records get written up back in the office, long after the work was done on site.
Incomplete handover packs
Final handover becomes a scramble to assemble records that were never captured cleanly.
PMs constantly chasing
Project Managers spend their day chasing status updates instead of managing delivery.
Built By Someone Who's Been There
One Platform. Every Cable. Every Stage.
From schedule import to final handover, Cabledox keeps every cable record in one place.
Cable Schedule Management
One live cable schedule for the whole project, accessible on site and in the office.
QA Tracking
Capture test results and QA as the work happens, with a full audit trail.
Final Check Sheets
Configurable check sheets completed on site, signed off and stored automatically.
How Much Is Cable Documentation Costing Your Business?
Enter your numbers to see what poor cable documentation is costing your business every year. Then join our pilot study to measure the real improvement on your next project.
Where the waste is coming from
| Electricians | |
| Walking time | 0h · £0 |
| Duplicate paperwork | 0h · £0 |
| Drawing/schedule search | 0h · £0 |
| On-site QA documentation | 0h · £0 |
| In the office | |
| Schedule preparation | 0h · £0 |
| Progress chasing | 0h · £0 |
| Handover preparation | 0h · £0 |
| Snagging coordination | 0h · £0 |
| Estimated annual waste | £0 |
Based on your inputs, with a conservative 40% assumed recovery of the hours you enter. These are estimates, not measured results.
Join the Pilot Study →Join the Cabledox Pilot Study
We're working with a small number of UK electrical contractors to measure the real impact of Cabledox on live projects. You'll get full access, personal onboarding, and a verified results report at the end of your first project.
- Full access to Cabledox on your next project
- Personal onboarding from the founder
- Verified results report — real hours and £ saved
- Direct input into the product roadmap
- Early adopter pricing when we launch commercially
- Limited spaces — we're working with 10 contractors maximum
The Business Case for Cabledox
For Managing, Commercial and Finance Directors who need measurable return.
Reduce labour costs
Recover billable hours lost to documentation and admin.
Improve project profitability
Protect margin by catching errors before they become rework.
Reduce project administration
Remove duplicate paperwork across the project lifecycle.
Improve visibility
Give directors real-time insight into every project.
Create measurable ROI
Quantify savings with a clear, defensible business case.
Five Steps From Schedule to Handover
Import Cable Schedule
Bring in your consultant schedule with smart schedule import.
Track Every Cable
Every cable on the job in one live schedule, visible to site and office.
Manage Installation
Track installation progress against the live schedule.
Complete QA on Site
Capture test results, final check sheets, and QA inspection records as you go.
Complete Handover
Export a complete, audit-ready handover package.
Questions, Answered
See how much this could save your business.
Run the numbers in 60 seconds, then join Early Access to lock in early adopter pricing.